4 TOOL POSITION 2-AXIS 2.ND OPERATION.
A motorised pick-off spindle in the turret holds the finished part and is synchronised with the main spindle to give pipless part-off. The component in the pick-off is then machined with the 4 tool second operation station mounted at the opposite end of the bed to the main spindle. Motorised tooling is also available as an option in the second op.
|